Structural steel for Rosenstein tunnel
1
1

6.000 tons of reinforcing steel

SÜLZLE steel partner Denkendorf supplies structural steel for Rosenstein tunnel

From 2021, traffic is to roll through the last section to disentangle the traffic flows between the LEUZE Mineralbad and Pragsattel junctions. In two tubes, the Stuttgart B10 Rosenstein Tunnel will in future pass under Wilhelma and Rosensteinpark.

The removal of traffic lanes and the creation of additional green spaces will significantly relieve the burden on residents along Pragstrasse and Neckartalstrasse. SÜLZLE Stahlpartner Denkendorf supplied around 6,000 tons of reinforcing steel, 150 tons of bearing mats, 200 tons of list mats and 20,000 bolted joints for portals, tunnel sections and operating buildings. For the tunnel project, which has been managed by Wolff & Müller Ingenieurbau GmbH since work began in 2014, many complex bending forms had to be created. A task that the SÜLZLE Stahlpartner branch from Denkendorf mastered with its usual bravura.

Facts and figures about the project:

6.000 tonns

Reinforcing steel

150 tons

Storage mats

200 tons

List mats

20.000

Screw sockets

Location of the reference project “Rosensteintunnel”

Stuttgart

B10 und B14
Connection at the Leuze

Google Maps

By loading the map you accept the privacy policy of this website and Google.
Privacy policy Google
Privacy policy of this website

Load map

SÜLZLE Stahlpartner branch in Denkendorf:

Sülzle Stahlpartner GmbH
Niederlassung Denkendorf

Körschtalstraße 96
73770 Denkendorf
Germany

Tel. +49 711 620082 – 0
Fax +49 711 620082 – 19
denkendorf@suelzle-stahlpartner.de

Naser Alili

Branch Manager

Tel. +49 711 620082 – 13
Fax +49 711 620082 – 19
Mail naser.alili@suelzle-stahlpartner.de

Location-Manager in Denkendorf: Naser Alili
Further references infrastructure projects
Locations